Control failure to F011 occurred when operated trolley with hoist both same time,Checked the encoder connection , power ...
RT
Sep 22, 2025
Week 39
Near / Far fault, Removed & replaced the CUVC & T400 card.
RT
Sep 22, 2025
Week 39
Gantry travelling failure due to SiNAMIC drive fault F07809/ chain to crane anticollision LHS time to time detected with ...
RT
Sep 22, 2025
Week 39
Trolley travelling failure due to abnormal vibration when trolley traveling,P1 & P04 trolley guide wheels lubricated ( n ...
QC
Sep 22, 2025
Week 39
Trolley travelling failure, Trolly syncronized Fault,Clean the Boom limit swich And reset
QC
Sep 22, 2025
Week 39
Trolley travelling failure, Trolly syncronized Fault reset
QC
Sep 22, 2025
Week 39
Boom function failure, Boom emergancy brake unit seal leack and replaced.po#04( down LHS)
QC
Sep 22, 2025
Week 39
Unable to spreader adjust to 20ft & 40ft, SQ 32 Spreader Power reset & Fault corrected
RT
Sep 22, 2025
Week 39
Control failure, fuel Pump Fail,Repaced Fuel pump from RT11 Removed Engine
RT
Sep 22, 2025
Week 39
Oil Leak, Engine Oil leak from Deep stick ,Top up 5L ,Fault corected
QC
Sep 22, 2025
Week 39
Spreader function failure, SQ28 pwer supply short circuit and stuck in ship,replaced the spreader SQ31
RT
Sep 22, 2025
Week 39
Hoisting lowering failure, Recalibration activated and corrected
RT
Sep 22, 2025
Week 39
Lock Unlock Fault, P#4 side shifting spick motor trip off,Power reset
QC
Sep 22, 2025
Week 39
Trolley travelling failure, Emergancy brake signal activated and ajusted
RT
Sep 22, 2025
Week 39
Gantry travelling failure due to P#02 encoder mounting bolt loosen & wire conection,Rethgtern the encorder mountinng bol ...
| Week | Date | Shift | Plant | Description | Status | Duration | Group |
|---|---|---|---|---|---|---|---|
| Week 39 | Sep 22, 2025 | Night |
RT28
RT
|
Control failure to F011 occurred when operated trolley with hoist both same time,Checked the encoder ... Control failure |
Completed | 2h 55min | 2 |
| Week 39 | Sep 22, 2025 | Night |
RT22
RT
|
Near / Far fault, Removed & replaced the CUVC & T400 card. |
Completed | 25min | 2 |
| Week 39 | Sep 22, 2025 | Night |
RT36
RT
|
Gantry travelling failure due to SiNAMIC drive fault F07809/ chain to crane anticollision LHS time t ... Gantry travelling failure |
Completed | 20min | 1 |
| Week 39 | Sep 22, 2025 | Night |
RT28
RT
|
Trolley travelling failure due to abnormal vibration when trolley traveling,P1 & P04 trolley guide w ... Trolley travelling failure |
Completed | 1h | 2 |
| Week 39 | Sep 22, 2025 | Day |
QC12
QC
|
Trolley travelling failure, Trolly syncronized Fault,Clean the Boom limit swich And reset Trolley travelling failure |
Completed | 10min | 1 |
| Week 39 | Sep 22, 2025 | Day |
QC12
QC
|
Trolley travelling failure, Trolly syncronized Fault reset Trolley travelling failure |
Completed | 9min | 1 |
| Week 39 | Sep 22, 2025 | Day |
QC01
QC
|
Boom function failure, Boom emergancy brake unit seal leack and replaced.po#04( down LHS) |
Completed | 1h 20min | 1 |
| Week 39 | Sep 22, 2025 | Day |
QC09
QC
|
Unable to spreader adjust to 20ft & 40ft, SQ 32 Spreader Power reset & Fault corrected |
Completed | 13min | 1 |
| Week 39 | Sep 22, 2025 | Day |
RT13
RT
|
Control failure, fuel Pump Fail,Repaced Fuel pump from RT11 Removed Engine Control failure |
Completed | 5h | 1 |
| Week 39 | Sep 22, 2025 | Day |
RT26
RT
|
Oil Leak, Engine Oil leak from Deep stick ,Top up 5L ,Fault corected |
Completed | 16min | 1 |
| Week 39 | Sep 22, 2025 | Day |
QC11
QC
|
Spreader function failure, SQ28 pwer supply short circuit and stuck in ship,replaced the spreader SQ ... Spreader function failure |
Completed | 1h 24min | 1 |
| Week 39 | Sep 22, 2025 | Day |
RT29
RT
|
Hoisting lowering failure, Recalibration activated and corrected Hoisting lowering failure |
Completed | 10min | 1 |
| Week 39 | Sep 22, 2025 | Day |
RT37
RT
|
Lock Unlock Fault, P#4 side shifting spick motor trip off,Power reset |
Completed | 19min | 1 |
| Week 39 | Sep 22, 2025 | Day |
QC09
QC
|
Trolley travelling failure, Emergancy brake signal activated and ajusted Trolley travelling failure |
Completed | 11min | 1 |
| Week 39 | Sep 22, 2025 | Night |
RT22
RT
|
Gantry travelling failure due to P#02 encoder mounting bolt loosen & wire conection,Rethgtern the en ... Gantry travelling failure |
Completed | 1h 55min | 2 |